Close Menu
    What's Hot

    Zscaler, Together With Bharti Airtel, Announce Launch of AI & Cyber Threat Research Center to Advance Cyber Resilience and Trusted AI Adoption

    February 21, 2026

    Airtel launches new AI-powered protection from ‘frauds caused by OTP leakages’

    February 11, 2026

    Häfele India Opens Its Largest-Ever Flagship Design Centre in Gurugram

    February 6, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Finance KhabarFinance Khabar
    • Home
    • Fixed Deposit
    • Personal Loan
    • Home Loan
    • Mutual Fund
    • Insurance
    • Credit Card
    • Equities
    • M&A
    • Start Ups
    • Banks
    • Others
      • P R
    Finance KhabarFinance Khabar
    Home»Others»Ind-Ra downgrades NTPC BHEL Power Projects to B+ with negative outlook
    Others

    Ind-Ra downgrades NTPC BHEL Power Projects to B+ with negative outlook

    Finance KhabarBy Finance KhabarApril 25, 2020No Comments1 Min Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Mumbai: India Ratings and Research (Ind-Ra) has downgraded NTPC BHEL Power Projects Pvt Ltd’s (NBPPL) long-term issuer rating to B-plus from BB-minus with a negative outlook.

    NBPPL, an equal joint-venture between NTPC and BHEL, was established to undertake engineering, procurement and construction (EPC) contracts for power plants and other infrastructure projects. The company is also engaged in manufacturing of coal handling plants and ash handling plants at Mannavaram in Andhra Pradesh.

    “NBPPL’s inability to make timely payments to the operational creditors resulting in disorderly winding down of operations and the reduced support from the parents coupled with further deterioration in the operating performance will be negative for the ratings,” said Ind-Ra.

    The company’s revenue declined to Rs 70 crore in FY19 from Rs 130 crore in FY18, led by the slow project execution and the absence of new orders.

    The company has not received any new orders in the EPC segment post-2013 and in the manufacturing operations segment since 2016, which limits the scaling up of operations.

    This along with the company’s complete dependence on the low-margin project at Unchahar in Uttar Pradesh with an unexecuted order book of Rs 280 crore constrains its ratings.

    indraw
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleOnline payments dip 30% during 30 days of lockdown: Razorpay
    Next Article Kamdhenu Paints contribute its bit to the society by helping painters
    Finance Khabar

    Related Posts

    Kerala HC Orders Vigilance Probe Into Missing Gold at Sabarimala Temple

    September 18, 2025

    Feel the Calm and Love the Cool with Atomberg Fans

    July 24, 2025

    Nothing Phone (3) and Nothing Headphone (1) Now On Sale in India

    July 16, 2025
    Add A Comment

    Comments are closed.

    Top Posts

    Zscaler, Together With Bharti Airtel, Announce Launch of AI & Cyber Threat Research Center to Advance Cyber Resilience and Trusted AI Adoption

    February 21, 2026

    Airtel launches new AI-powered protection from ‘frauds caused by OTP leakages’

    February 11, 2026

    Häfele India Opens Its Largest-Ever Flagship Design Centre in Gurugram

    February 6, 2026

    Subscribe to Updates

    Stay in the know with Finance Khabar! Never miss a beat when it comes to the latest in finance, investing, and personal finance tips.

    Thank you for choosing Finance Khabar as your go-to resource for all things finance. We're here to help you achieve financial success!

    Facebook X (Twitter) Instagram
    Quick Links
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Term And Conditions
    Copyright © 2026 FINANCE KHABAR. All Rights Reserved

    Type above and press Enter to search. Press Esc to cancel.