Close Menu
    What's Hot

    Zscaler, Together With Bharti Airtel, Announce Launch of AI & Cyber Threat Research Center to Advance Cyber Resilience and Trusted AI Adoption

    February 21, 2026

    Airtel launches new AI-powered protection from ‘frauds caused by OTP leakages’

    February 11, 2026

    Häfele India Opens Its Largest-Ever Flagship Design Centre in Gurugram

    February 6, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Finance KhabarFinance Khabar
    • Home
    • Fixed Deposit
    • Personal Loan
    • Home Loan
    • Mutual Fund
    • Insurance
    • Credit Card
    • Equities
    • M&A
    • Start Ups
    • Banks
    • Others
      • P R
    Finance KhabarFinance Khabar
    Home»Others»Govt. allows pastureland owned by small farmers for solar power plant development
    Others

    Govt. allows pastureland owned by small farmers for solar power plant development

    Finance KhabarBy Finance KhabarNovember 13, 2020No Comments1 Min Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    New Delhi: The ministry of new and renewable energy had amended guidelines of of Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme is expanding its scope to include new areas for setting up of solar power plants in rural agricultural areas.

    The scheme so far allowed power plants only on barren, fallow and agricultural land. But with the changes, solar power plants can now also be installed on pastureland and marshy land of farmers.

    Changes have also been made on the size of the power plant so that it makes it easier even for small farmers to invest in power generation. Accordingly, the solar power projects smaller than 500 kW can now be permitted by States based on techno-commercial feasibility.

    Also, the selected Renewable Power Generator (RPG) have been given more time to commision the project with deadline for completion being extended by three months to 12 months from the date of issuance of Letter of Award (LoA). Moreover, no penalty will be levied on RPG for shortfall in solar power generation from minimum prescribed Capacity Utilization Factor (CUF).

    solar
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleSensex and the Nifty have closed in the green mark
    Next Article Patanjali Ayurved profits up 21.56% in FY20
    Finance Khabar

    Related Posts

    Kerala HC Orders Vigilance Probe Into Missing Gold at Sabarimala Temple

    September 18, 2025

    Feel the Calm and Love the Cool with Atomberg Fans

    July 24, 2025

    Nothing Phone (3) and Nothing Headphone (1) Now On Sale in India

    July 16, 2025
    Add A Comment

    Comments are closed.

    Top Posts

    Zscaler, Together With Bharti Airtel, Announce Launch of AI & Cyber Threat Research Center to Advance Cyber Resilience and Trusted AI Adoption

    February 21, 2026

    Airtel launches new AI-powered protection from ‘frauds caused by OTP leakages’

    February 11, 2026

    Häfele India Opens Its Largest-Ever Flagship Design Centre in Gurugram

    February 6, 2026

    Subscribe to Updates

    Stay in the know with Finance Khabar! Never miss a beat when it comes to the latest in finance, investing, and personal finance tips.

    Thank you for choosing Finance Khabar as your go-to resource for all things finance. We're here to help you achieve financial success!

    Facebook X (Twitter) Instagram
    Quick Links
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Term And Conditions
    Copyright © 2026 FINANCE KHABAR. All Rights Reserved

    Type above and press Enter to search. Press Esc to cancel.